Z Zomefy

RERA registered P52100080265 Active

Gv7 Insignia Building B And C

Ambegaon Budruk, Pune · Residential / Group Housing by M/S Chirag Developers

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Gv7 Insignia Building B And C in Ambegaon Budruk is MahaRERA-registered (P52100080265) and still under construction, with possession filed for April 2030. Buyers have already registered 55 sales here at a median ₹10,361 per sq ft of carpet — not an asking price. About 47% of the 118 units are sold. M/S Chirag Developers is the promoter.

Stock image, not a photograph of Gv7 Insignia Building B And C Stock image
Where
Ambegaon Budruk
pincode 411046
Sold here at
₹10,361
per sq ft, 55 registered sales
Available
1, 2, 3, 4 BHK
63 left · 536–1,210 sq ft
Now due
Apr 2030
4 months later than first promised
A stock photograph, not Gv7 Insignia Building B And C. We have no picture of this site yet.

Where this is

Ambegaon Budruk, PMC, Pune, 411046

Village
AMBEGAON Bk
Taluka
Haveli
Pincode
411046

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 118 flats are filed unit by unit with the authority, the highest on floor 15. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 4 units · all available

4 units 536 sq ft 49.75 sq m as filed

2 BHK 42 units · 23 available

14 units 715 sq ft 66.4 sq m as filed
25 units 739 sq ft 68.61–68.65 sq m as filed
1 unit 794 sq ft 73.8 sq m as filed
1 unit 818 sq ft 75.99 sq m as filed
1 unit 819 sq ft 76.11 sq m as filed

3 BHK 31 units · 13 available

2 units 930 sq ft 86.37 sq m as filed
14 units 970 sq ft 90.13 sq m as filed
14 units 1003 sq ft 93.15–93.17 sq m as filed
1 unit 1038 sq ft 96.41 sq m as filed

4 BHK 14 units · 11 available

1 unit 1209 sq ft 112.34 sq m as filed
13 units 1210 sq ft 112.37 sq m as filed

Configuration not filed 27 units · 12 available

25 units 883 sq ft 82.02–82.03 sq m as filed
1 unit 963 sq ft 89.46 sq m as filed
1 unit 972 sq ft 90.3 sq m as filed
Units sold

55 / 118

Selling steadily

47% absorption rate

Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 4 flats · 4 available

536 sq ft carpet as drawn

Carpet, filed
536 sq ft
Built-up
about 643 sq ft
Super built-up
about 750 sq ft
Every room in this flat

Living and dining about 201 sq ft, Master bedroom about 134 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Passage about 27 sq ft.

2 BHK 42 flats · 23 available

739 sq ft carpet as drawn, from 715–819 sq ft filed in this configuration

Carpet, filed
739 sq ft
Built-up
about 887 sq ft
Super built-up
about 1,035 sq ft
Every room in this flat

Living and dining about 215 sq ft, Master bedroom about 143 sq ft, Second bedroom about 115 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 36 sq ft.

3 BHK 31 flats · 13 available

970 sq ft carpet as drawn, from 930–1,038 sq ft filed in this configuration

Carpet, filed
970 sq ft
Built-up
about 1,164 sq ft
Super built-up
about 1,358 sq ft
Every room in this flat

Living and dining about 239 sq ft, Master bedroom about 159 sq ft, Second bedroom about 127 sq ft, Third bedroom about 103 sq ft, Kitchen about 95 sq ft, Bath about 56 sq ft, Balcony about 56 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.

4 BHK 14 flats · 11 available

1,210 sq ft carpet as drawn, from 1,209–1,210 sq ft filed in this configuration

Carpet, filed
1,210 sq ft
Built-up
about 1,452 sq ft
Super built-up
about 1,694 sq ft
Every room in this flat

Living and dining about 269 sq ft, Master bedroom about 179 sq ft, Second bedroom about 143 sq ft, Third bedroom about 117 sq ft, Kitchen about 108 sq ft, Fourth bedroom about 108 sq ft, Bath about 63 sq ft, Balcony about 63 sq ft, Passage about 63 sq ft, Second bath about 54 sq ft, Third bath about 45 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹10,361 per sq ft of carpet, median of 55 registered sales
Range across those sales ₹8,751 to ₹11,893 per sq ft
Sold and booked 50 sold, 5 booked
Still available 63 flats, 536–1210 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2029
Current status Due Apr 2030

Revised projection

The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NO. 3/1 TO 4/1/4/1, 3/1 TO 4/1/4/2, 3/1 TO 4/1/4/2/2, 3/1 TO 4/1/4/2/3, 3/1 TO 4/1/4/4, 3/1 TO 4/1/4/5 is the plot this project is built on, as filed
Revenue village AMBEGAON Bk · shown on this site as Ambegaon Budruk
TalukaHaveli
Street, as filed AMBEGAON BUDRUK
Bounded north by BY BUILDING A OF THE SAME PROJECT
Bounded east by BY 12 MT WIDE INTERNAL ROAD
Bounded south by BY AMENITY SPACE
Bounded west by BY OPEN SPACE TO AND ADJ S NO 3

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerM/S Chirag Developers
Registered officeS No. 6, Grande View 7, Near Ashok Leyland, Pune 411046

Professionals named on the filing

Architect Voussoirs THROUGH MR SAMEER VALIMBE CA/92/14618
Engineer Dnyaneshwar Awhale
Engineer Mayuresh Gidde
Engineer Siddiki Mujib
Chartered Accountant Pradeep B. More 147817

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

16 April 2025 is when an advocate last certified the title to this land
Title report Search and title report final - GV7.pdf 16 April 2025
Promoter's declaration, Form B Affidavit cum declaration on stamp paper.pdf 16 April 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100080265
Promoter M/S Chirag Developers
Project typeResidential / Group Housing · Building development
LocalityAmbegaon Budruk — Haveli taluka, pincode 411046
Applied on29 April 2025
Registered on15 May 2025
Completion, as first filed31 December 2029
Due30 April 2030 4 months later
Units declared118
Units sold 55 of 118 sold (47%), 63 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 15 May 2025
Application referenceREA52100168856
Current statusActive
Record last changed 15 May 2025 · 16 months ago

Where the sold count comes from, and whether it holds up. 55 of 118 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 118 flats and reaches the same answer — 50 sold, every one with money recorded as received against a named flat, 5 booked with a price agreed but nothing received yet, and 63 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 May 2025.

Common questions

Is Gv7 Insignia Building B And C registered with MahaRERA?
Yes. It is registered as P52100080265, filed on 15 May 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Gv7 Insignia Building B And C due to be handed over?
The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Gv7 Insignia Building B And C been delayed?
Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
What did buyers actually pay in Gv7 Insignia Building B And C?
A median of ₹10,361 per square foot of carpet, across 55 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Gv7 Insignia Building B And C?
63 of 118 were still unsold at the promoter's last filing, in 1, 2, 3, 4 BHK, from 536–1,210 sq ft of carpet.
Are there complaints against Gv7 Insignia Building B And C?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Gv7 Insignia Building B And C?
M/S Chirag Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100080265 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Ambegaon Budruk