Stella F3

Alandi, Pune · Commercial by Dmk Infrastructure Pvt Ltd

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Stella F3 in Alandi is MahaRERA-registered (P52100054729) and still under construction, with possession filed for March 2027. No registered sales are on file here yet. The government values the units from ₹4,303 per sq ft of carpet, a stamp-duty floor rather than a market price. About 64% of the 45 units are sold. 1 complaint sits on the filing. Dmk Infrastructure Pvt Ltd is the promoter.

Stock image, not a photograph of Stella F3 Stock image
Where
Alandi
pincode 412105
Valued from
₹4,303
per sq ft, the government’s floor
Available
Office Space, Shops
16 left · 197–517 sq ft
Now due
Mar 2027
a year later than first promised
A stock photograph, not Stella F3. We have no picture of this site yet.

Where this is

Alandi, PCMC, Pune, 412105

Taluka
Mulshi
Pincode
412105

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 45 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Office Space 36 units · 13 available

12 units 197 sq ft 18.27 sq m as filed
4 units 245 sq ft 22.77 sq m as filed
16 units 258 sq ft 23.99 sq m as filed
4 units 432 sq ft 40.09 sq m as filed

Shops 9 units · 3 available

4 units 388 sq ft 36.0 sq m as filed
5 units 517 sq ft 48.0 sq m as filed
Units sold

29 / 45

Selling steadily

64% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 36 units · 13 available

258 sq ft carpet as drawn, from 197–432 sq ft filed in this configuration

Carpet, filed
258 sq ft
Built-up
about 310 sq ft
Super built-up
about 361 sq ft

Shops 9 units · 3 available

517 sq ft carpet as drawn, from 388–517 sq ft filed in this configuration

Carpet, filed
517 sq ft
Built-up
about 620 sq ft
Super built-up
about 724 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What these units are valued at

No sale has been registered at Stella F3 yet. The promoter has filed no agreement values, so nothing below is this project's own price.

On sale here Carpet Valued at no less than
Office Space 13 unsold 197–432 sq ft ₹8.2 lakh–₹19.4 lakh ₹4,494/sq ft
Shops 3 unsold 388–517 sq ft ₹11.7 lakh–₹15.7 lakh ₹3,031/sq ft

This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Mar 2026
Current status Due Mar 2027

Revised projection

The completion date has moved from March 2026 to March 2027, a year later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. No./Gat No.216/2 (P), Dudulgaon is the plot this project is built on, as filed
TalukaMulshi
Street, as filed Moshi Alandi Road
Bounded north by Pawarand remaining portion of Gat No 216
Bounded east by Property out of Gat No 215
Bounded south by Property of Mr Nivrutti G Saste
Bounded west by DP Road and Moshi - Dudulgaon Boundry

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerDmk Infrastructure Pvt Ltd
Registered office216 2, 66, Project Stella, Moshi Alandi Road, Behind Ostia, Moshi, Pune 412105

Professionals named on the filing

Architect Ar Sunil Nawale 15738
Engineer Mr. Vishal Ingle
Engineer Swapnil Bondar
Chartered Accountant DAPNS & Co. Chartered Accountants 418100
Chartered Accountant Gandhi Kale 168354

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC005000000340739 Apr 2024 Order passed Apr 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

25 January 2024 is when an advocate last certified the title to this land
Title report Search Report-1-5_11zon (1).pdf 25 January 2024 3 older versions on file
Promoter's declaration, Form B Stella F3 - Form B.pdf 11 January 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100054729
Promoter Dmk Infrastructure Pvt Ltd
Project typeCommercial · Building development
LocalityAlandi — Mulshi taluka, pincode 412105
Applied on11 January 2024
Registered on06 February 2024
Completion, as first filed31 March 2026
Due31 March 2027 a year later
Units declared45
Units sold 29 of 45 sold (64%), 16 still unsold
Complaints1 on record with MahaRERA
Certificate on file Extension certificate, issued 20 August 2026
Application referenceREA52100152103
Current statusActive
Record last changed 06 June 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 29 of 45 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 45 units and reaches the same answer — 29 sold, 26 of them with money recorded as received against a named unit, and 16 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 June 2026.

Common questions

Is Stella F3 registered with MahaRERA?
Yes. It is registered as P52100054729, filed on 06 February 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Stella F3 due to be handed over?
The promoter has told MahaRERA March 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Stella F3 been delayed?
Yes. The first date filed was March 2026. It now stands at March 2027, a year later.
What does a unit in Stella F3 cost?
Nothing has been registered here yet. The government values the units at ₹4,303 per square foot of carpet, which is the floor stamp duty is charged on and is normally below what anyone pays.
How many units are left in Stella F3?
16 of 45 were still unsold at the promoter's last filing, in Offices + shops, from 197–517 sq ft of carpet.
Are there complaints against Stella F3?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Stella F3?
Dmk Infrastructure Pvt Ltd, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100054729 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Alandi

Stock image, not a photograph of Paramount - Phase I Stock image
Registered here
₹7,801
On offer
1 BHK
Under construction

Paramount - Phase I

G B Developers · Alandi

60 sold
Slipped 6 years
Due
Dec 2029
Units
42
Carpet
363–546
Sold at
₹38.6 lakh
P52100017803