Z Zomefy

RERA registered P52100029815 Active

Shlok

Alandi, Pune · Others by Vrunda Ventures LLP

Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.

In short

Shlok in Alandi is MahaRERA-registered (P52100029815) and still under construction, with possession filed for December 2026. Buyers have already registered 286 sales here at a median ₹6,370 per sq ft of carpet — not an asking price. About 97% of the 327 units are sold. 8 complaints sit on the filing. Vrunda Ventures LLP is the promoter.

Stock image, not a photograph of Shlok Stock image
Where
Alandi
pincode 412105
Sold here at
₹6,370
per sq ft, 286 registered sales
Available
3 BHK
9 left · 905 sq ft
Possession
Dec 2026
as filed with MahaRERA
A stock photograph, not Shlok. We have no picture of this site yet.

Where this is

Alandi, PCMC, Pune, 412105

Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
412105

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 327 units are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 180 units · all sold

53 units 635 sq ft 58.99 sq m as filed
88 units 697 sq ft 64.72–64.79 sq m as filed
30 units 716 sq ft 66.5 sq m as filed
4 units 737 sq ft 68.47 sq m as filed
3 units 880 sq ft 81.75 sq m as filed
1 unit 885 sq ft 82.24 sq m as filed
1 unit 1138 sq ft 105.71 sq m as filed

3 BHK 97 units · 9 available

11 units 878 sq ft 81.56 sq m as filed
52 units 905 sq ft 84.09 sq m as filed
33 units 964 sq ft 89.56 sq m as filed
1 unit 1138 sq ft 105.71 sq m as filed

Configuration not filed 18 units · all sold

6 units 584 sq ft 54.22 sq m as filed
12 units 613 sq ft 56.92–56.98 sq m as filed

Shops 32 units · all sold

4 units 229 sq ft 21.31 sq m as filed
2 units 232 sq ft 21.55 sq m as filed
2 units 238 sq ft 22.11 sq m as filed
4 units 282 sq ft 26.21 sq m as filed
2 units 286 sq ft 26.57 sq m as filed
2 units 329 sq ft 30.56 sq m as filed
1 unit 337 sq ft 31.35 sq m as filed
1 unit 338 sq ft 31.36 sq m as filed
2 units 342 sq ft 31.73 sq m as filed
4 units 352 sq ft 32.67 sq m as filed
4 units 403 sq ft 37.48 sq m as filed
2 units 421 sq ft 39.14 sq m as filed
2 units 534 sq ft 49.57 sq m as filed
Units sold

318 / 327

Nearly sold out

97% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 180 units · none available

697 sq ft carpet as drawn, from 635–1,138 sq ft filed in this configuration

Carpet, filed
697 sq ft
Built-up
about 836 sq ft
Super built-up
about 976 sq ft
Every room in this unit

Living and dining about 203 sq ft, Master bedroom about 135 sq ft, Second bedroom about 108 sq ft, Kitchen about 81 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 41 sq ft, Passage about 34 sq ft.

3 BHK 97 units · 9 available

905 sq ft carpet as drawn, from 878–1,138 sq ft filed in this configuration

Carpet, filed
905 sq ft
Built-up
about 1,086 sq ft
Super built-up
about 1,267 sq ft
Every room in this unit

Living and dining about 223 sq ft, Master bedroom about 148 sq ft, Second bedroom about 119 sq ft, Third bedroom about 96 sq ft, Kitchen about 89 sq ft, Bath about 52 sq ft, Balcony about 52 sq ft, Second bath about 45 sq ft, Passage about 45 sq ft, Third bath about 37 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,370 per sq ft of carpet, median of 286 registered sales
Range across those sales ₹4,431 to ₹8,975 per sq ft
Sold and booked 295 sold, 23 booked
Still available 9 units, 229–1138 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

1 further sale is set aside. It divides out beyond ₹15,925 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Dec 2026
Current status Due Dec 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT NO. 122 P AND 123 P AT BORHADEWADI is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Alandi
TalukaHaveli
Street, as filed BORHADEWADI
Bounded north by GAT 122 P
Bounded east by GAT 121 114 AND 113
Bounded south by GAT 112
Bounded west by 18 MTR WIDE ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerVrunda Ventures LLP
Registered officeGat No. 122 P And 123 P, Gat No. 122 & 123 P, Shlok, Borhadewadi, Moshi, Pune 412105

Professionals named on the filing

Architect Arcon Assocites CA/2010/48607
Engineer Spectrum Consultants
Engineer Sandesh Arjun Mote 05138178
Chartered Accountant CA Dolly Gandhi 635220
Chartered Accountant Navdeep Jindal & Associates 164075

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

8 cases against this project, 8 with an order on record, filed between Jan 2025 and Feb 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12601090 Feb 2026 Order passed Feb 2026
CC12601065 Feb 2026 Order passed Feb 2026
CC12601066 Feb 2026 Order passed Feb 2026
CC12601067 Feb 2026 Order passed Feb 2026
CC12501919 Jun 2025 Order passed Jun 2025
CC12501862 Jun 2025 Order passed Jun 2025
CC12501828 Jun 2025 Order passed Jun 2025
CC12500214 Jan 2025 Order passed Jan 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

1 July 2021 is when an advocate last certified the title to this land
Title report SEARCH REPORT IN RERA FORMAT - VRUNDA SHLOK 1.pdf 1 July 2021 1 older version on file
Promoter's declaration, Form B Declaration Form B-compressed.pdf 30 June 2021

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100029815
Promoter Vrunda Ventures LLP
Project typeOthers · Building development
LocalityAlandi — Haveli taluka, pincode 412105
Applied on01 July 2021
Registered on08 July 2021
Completion, as first filed31 December 2026
Due31 December 2026
Units declared327
Units sold 318 of 327 sold (97%), 9 still unsold
Complaints8 on record with MahaRERA
Certificate on file Original registration certificate, issued 21 May 2024
Application referenceREA52100091303
Current statusActive
Record last changed 23 February 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 318 of 327 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 327 units and reaches the same answer — 295 sold, every one with money recorded as received against a named unit, 23 booked with a price agreed but nothing received yet, and 9 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 23 February 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Shlok registered with MahaRERA?
Yes. It is registered as P52100029815, filed on 08 July 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Shlok due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Shlok been delayed?
No. December 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Shlok?
A median of ₹6,370 per square foot of carpet, across 286 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Shlok?
9 of 327 were still unsold at the promoter's last filing, in 3 BHK, from 905 sq ft of carpet.
Are there complaints against Shlok?
8 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Shlok?
Vrunda Ventures LLP, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100029815 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Alandi

Stock image, not a photograph of Vrinda Stock image
Registered here
₹6,214
On offer
Offices
Under construction

Vrinda

Sapphire Developers · Alandi

70 sold
Due
Mar 2027
Units
242
Carpet
313
Sold at
₹34.7 lakh
P52100048911
Stock image, not a photograph of Vrudhi Heights Stock image
Registered here
₹4,966
On offer
1 BHK
Under construction

Vrudhi Heights

Ram Properties · Alandi

69 sold
Slipped 2 years
Due
Dec 2027
Units
13
Carpet
423–424
Sold at
₹21 lakh
P52100054295