In short

Kesar Highstreet C Bldg in Alandi is MahaRERA-registered (P52100077044) and still under construction, with possession filed for April 2028. Buyers have already registered 107 sales here at a median ₹8,452 per sq ft of carpet — not an asking price. About 49% of the 217 units are sold. Kasata Properties is the promoter.

Stock image, not a photograph of Kesar Highstreet C Bldg Stock image
Where
Alandi
pincode 412105
Sold here at
₹8,452
per sq ft, 107 registered sales
Available
2, 3 BHK
97 left · 591–822 sq ft
Now due
Apr 2028
4 months later than first promised
A stock photograph, not Kesar Highstreet C Bldg. We have no picture of this site yet.

Where this is

Alandi, PCMC, Pune, 412105

Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
412105
Coordinates
18.663162, 73.837500

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 217 flats are filed unit by unit with the authority, the highest on floor 22. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 111 units · 21 available

1 unit 591 sq ft 54.93 sq m as filed
1 unit 639 sq ft 59.32 sq m as filed
22 units 647 sq ft 60.13 sq m as filed
22 units 655 sq ft 60.85 sq m as filed
22 units 676 sq ft 62.76–62.79 sq m as filed
41 units 704 sq ft 65.43 sq m as filed
2 units 822 sq ft 76.34 sq m as filed

3 BHK 64 units · 34 available

1 unit 791 sq ft 73.53 sq m as filed
21 units 792 sq ft 73.54 sq m as filed
22 units 809 sq ft 75.12–75.16 sq m as filed
1 unit 821 sq ft 76.29 sq m as filed
19 units 822 sq ft 76.34 sq m as filed

Configuration not filed 42 units · all available

21 units 591 sq ft 54.93 sq m as filed
21 units 639 sq ft 59.32 sq m as filed
Units sold

107 / 217

Selling steadily

49% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 111 flats · 21 available

704 sq ft carpet as drawn, from 591–822 sq ft filed in this configuration

Carpet, filed
704 sq ft
Built-up
about 845 sq ft
Super built-up
about 986 sq ft
Every room in this flat

Living and dining about 205 sq ft, Master bedroom about 137 sq ft, Second bedroom about 109 sq ft, Kitchen about 82 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 34 sq ft.

3 BHK 64 flats · 34 available

809 sq ft carpet as drawn, from 791–822 sq ft filed in this configuration

Carpet, filed
809 sq ft
Built-up
about 971 sq ft
Super built-up
about 1,133 sq ft
Every room in this flat

Living and dining about 199 sq ft, Master bedroom about 133 sq ft, Second bedroom about 106 sq ft, Third bedroom about 86 sq ft, Kitchen about 80 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 40 sq ft, Passage about 40 sq ft, Third bath about 33 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,452 per sq ft of carpet, median of 107 registered sales
Range across those sales ₹7,567 to ₹9,327 per sq ft
Sold and booked 54 sold, 53 booked
Still available 97 flats, 591–822 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT NO 741, 753, 755, 756, 757, BORHADEWADI is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Alandi
TalukaHaveli
Street, as filed 31 MTR HIGHSTREET ROAD OPP PIECC,PCMC,PUNE
Bounded north by 12 MTR DP ROAD
Bounded east by GAT NO 751 752
Bounded south by 31 MTR DP ROAD
Bounded west by 12 MTR DP ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKasata Properties
Registered officeGat No 741,755,756,757,753, 755, Kesar High Street, Highstreet Road, Opp Piecc, Borhadewadi, Pune 412105

Professionals named on the filing

Architect Anuradha Govardhan CA/92/14812
Engineer Sarvasiddhant Structural Engineers Pvt Ltd
Chartered Accountant Bhavik Jayantilal Velani 601247
Chartered Accountant Swati Sudhendu Patel 143967

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

13 June 2024 is when an advocate last certified the title to this land
Title report C wing legal title report new.pdf 13 June 2024
Promoter's declaration, Form B affidavit of promoter form b.pdf 14 June 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100077044
Promoter Kasata Properties
Project typeOthers · Building development
LocalityAlandi — Haveli taluka, pincode 412105
Applied on01 June 2024
Registered on16 July 2024
Completion, as first filed31 December 2027
Due30 April 2028 4 months later
Units declared217
Units sold 107 of 217 sold (49%), 110 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 16 July 2024
Application referenceREA52100160740
Current statusActive
Record last changed 16 July 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 107 of 217 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 217 flats and reaches the same answer — 54 sold, every one with money recorded as received against a named flat, 53 booked with a price agreed but nothing received yet, and 97 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 July 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Kesar Highstreet C Bldg registered with MahaRERA?
Yes. It is registered as P52100077044, filed on 16 July 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kesar Highstreet C Bldg due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kesar Highstreet C Bldg been delayed?
Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
What did buyers actually pay in Kesar Highstreet C Bldg?
A median of ₹8,452 per square foot of carpet, across 107 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Kesar Highstreet C Bldg?
97 of 217 were still unsold at the promoter's last filing, in 2, 3 BHK, from 591–822 sq ft of carpet.
Are there complaints against Kesar Highstreet C Bldg?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Kesar Highstreet C Bldg?
Kasata Properties, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100077044 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Alandi

Stock image, not a photograph of Dnyanvishwa Stock image
Registered here
₹4,461
On offer
1, 2 BHK
Under construction

Dnyanvishwa

Dattakrupa Associates · Alandi

36 sold
Slipped 6.1 years
Due
Dec 2030
Units
239
Carpet
399–433
Sold at
₹19.7 lakh
P52100014850
Stock image, not a photograph of Dwaarka Avenue Stock image
Registered here
₹5,240
On offer
2 BHK
Under construction

Dwaarka Avenue

Monarch Developers · Alandi

79 sold
Slipped 16 months
Due
Jul 2027
Units
28
Carpet
736–744
Sold at
₹38.8 lakh
P52100055016