RERA registered P52100053043 Active
Destination Ostia Building E1
Alandi, Pune · Residential / Group Housing by D R Gavhane Landmarks LLP
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Destination Ostia Building E1 in Alandi is MahaRERA-registered (P52100053043) and still under construction, with possession filed for April 2027. Buyers have already registered 96 sales here at a median ₹6,908 per sq ft of carpet — not an asking price. D R Gavhane Landmarks LLP is the promoter.
- Sold here at
- ₹6,908
- per sq ft, 96 registered sales
- Available
- 2, 3 BHK
- 24 left · 536–870 sq ft
- Possession
- Apr 2027
- as filed with MahaRERA
Where this is
Alandi, PCMC, Pune, 412105
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 120 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 71 units · 12 available
3 BHK 49 units · 12 available
92 / 120
77% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 71 flats · 12 available
665 sq ft carpet as drawn, from 536–665 sq ft filed in this configuration
- Carpet, filed
- 665 sq ft
- Built-up
- about 798 sq ft
- Super built-up
- about 931 sq ft
Every room in this flat
Living and dining about 194 sq ft, Master bedroom about 129 sq ft, Second bedroom about 103 sq ft, Kitchen about 77 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Second bath about 39 sq ft, Passage about 32 sq ft.
3 BHK 49 flats · 12 available
870 sq ft carpet as drawn, from 536–870 sq ft filed in this configuration
- Carpet, filed
- 870 sq ft
- Built-up
- about 1,044 sq ft
- Super built-up
- about 1,218 sq ft
Every room in this flat
Living and dining about 214 sq ft, Master bedroom about 143 sq ft, Second bedroom about 114 sq ft, Third bedroom about 93 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 43 sq ft, Third bath about 36 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,697 to ₹9,691 per sq ft |
|---|---|
| Sold and booked | 95 sold, 1 booked |
| Still available | 24 flats, 536–870 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pimpri Chinchawad (M Corp.) · shown on this site as Alandi |
|---|---|
| Taluka | Haveli |
| Bounded north by | By Gat No 216 |
| Bounded east by | By Gat No 215 and thereafter property of Mr Mhaske |
| Bounded south by | By Dehu Alandi Road |
| Bounded west by | By Dudulgaon Moshi Village Boundry |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | D R Gavhane Landmarks LLP |
|---|---|
| Registered office | S No 690/1A/111, 690, Kbc Classic, Pune Nashik Road, Above Png Jwellers, Bhosari, Pune 411039 |
Professionals named on the filing
| Architect | Voussoirs CA/92/14618 |
|---|---|
| Engineer | Girish Dilip Kale NA |
| Engineer | Girish Kale |
| Engineer | Rohinee Engineers PCMCLE/0651/2017 |
| Chartered Accountant | Cmrs & Associates LLP 212175 |
| Chartered Accountant | Parag S Savale & Associates 604593 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report 1 Copy of the legal title report (13) (1)_11zon.pdf | 21 August 2023 1 older version on file |
|---|---|
| Promoter's declaration, Form B B Form Builders E1 Bldg Ostia.pdf | 14 August 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100053043 |
| Promoter | D R Gavhane Landmarks LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Alandi — Haveli taluka, pincode 412105 |
| Applied on | 20 September 2023 |
| Registered on | 10 October 2023 |
| Completion, as first filed | 30 April 2027 |
| Due | 30 April 2027 |
| Units declared | 120 |
| Units sold | 92 of 120 sold (77%), 28 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 10 October 2023 |
| Application reference | REA52100146782 |
| Current status | Active |
| Record last changed | 19 January 2026 · 8 months ago |
Where the sold count comes from, and whether it holds up. 92 of 120 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 92 of 120 sold, leaving 28. The unit-by-unit list they file separately covers 120 flats and marks 95 sold with 24 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 19 January 2026.
Common questions
- Is Destination Ostia Building E1 registered with MahaRERA?
- Yes. It is registered as P52100053043, filed on 10 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Destination Ostia Building E1 due to be handed over?
- The promoter has told MahaRERA April 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Destination Ostia Building E1 been delayed?
- No. April 2027 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Destination Ostia Building E1?
- A median of ₹6,908 per square foot of carpet, across 96 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Destination Ostia Building E1?
- 24 of 120 were still unsold at the promoter's last filing, in 2, 3 BHK, from 536–870 sq ft of carpet.
- Are there complaints against Destination Ostia Building E1?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Destination Ostia Building E1?
- D R Gavhane Landmarks LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100053043 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Alandi
Stock image
- Due
- Dec 2027
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹5,516
- On offer
- 2 BHK + shops
- Due
- Dec 2027
- Units
- 136
- Carpet
- 127–958
- Sold at
- ₹26 lakh
Stock image
- Registered here
- ₹6,956
- On offer
- 1, 2 BHK +2 more
- Due
- Dec 2026
- Units
- 32
- Carpet
- 210–513
- Sold at
- ₹38.8 lakh