Z Zomefy

RERA registered P52100023339 Active

Tingre Elite Phase 1

Airport (Pune), Pune · Residential / Group Housing by Nitin Babanrao Tingre

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Tingre Elite Phase 1 in Airport (Pune) is MahaRERA-registered (P52100023339) and still under construction, with possession filed for December 2026. Buyers have already registered 49 sales here at a median ₹5,566 per sq ft of carpet — not an asking price. About 100% of the 56 units are sold. Nitin Babanrao Tingre is the promoter.

Stock image, not a photograph of Tingre Elite Phase 1 Stock image
Where
Airport (Pune)
pincode 411032
Sold here at
₹5,566
per sq ft, 49 registered sales
Available
None left
every unit filed as sold or held
Now due
Dec 2026
3.8 years later than first promised
A stock photograph, not Tingre Elite Phase 1. We have no picture of this site yet.

Where this is

Airport (Pune), Pune, 411032

Street map of Airport (Pune) centred on the coordinate filed for Tingre Elite Phase 1, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pune (M Corp.)
Taluka
Pune City
Pincode
411032
Coordinates
19.387500, 75.163200

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 56 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 20 units · all sold

20 units 407 sq ft 37.81 sq m as filed

2 BHK 30 units · all sold

20 units 499 sq ft 46.34 sq m as filed
10 units 555 sq ft 51.6 sq m as filed

Shops 6 units · all sold

4 units 107 sq ft 9.96 sq m as filed
2 units 129 sq ft 11.95 sq m as filed
Units sold

56 / 56

Nearly sold out

100% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 BHK 20 units · none available

407 sq ft carpet as drawn

Carpet, filed
407 sq ft
Built-up
about 488 sq ft
Super built-up
about 570 sq ft
Every room in this unit

Living and dining about 153 sq ft, Master bedroom about 102 sq ft, Kitchen about 61 sq ft, Bath about 36 sq ft, Balcony about 36 sq ft, Passage about 20 sq ft.

2 BHK 30 units · none available

499 sq ft carpet as drawn, from 499–555 sq ft filed in this configuration

Carpet, filed
499 sq ft
Built-up
about 599 sq ft
Super built-up
about 699 sq ft
Every room in this unit

Living and dining about 145 sq ft, Master bedroom about 97 sq ft, Second bedroom about 78 sq ft, Kitchen about 58 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Second bath about 29 sq ft, Passage about 24 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,566 per sq ft of carpet, median of 49 registered sales
Range across those sales ₹4,177 to ₹7,146 per sq ft
Sold and booked 56 sold, 0 booked
Still available 0 units, 107–555 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

1 further sale is set aside. It divides out beyond ₹13,737 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Mar 2023
Current status Due Dec 2026

Revised projection

The completion date has moved from March 2023 to December 2026, 3.8 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. NO. 163 HISSA NO 1B LOHEGAON TALUKA HAVELI PUNE 411047 is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Airport (Pune)
TalukaPune City
Street, as filed LOHEGAON
Bounded north by PROPOSED 15 M D P ROAD
Bounded east by S NO 163
Bounded south by S NO 163
Bounded west by S NO 163

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerNitin Babanrao Tingre
Registered officeS No 36/2/2, 36/2/2, Amrutwel, Lane No 5, Near Nyati Environ, Tingre Nagar, Pune 411015

Professionals named on the filing

Architect Somnath Kerur And Associates LE/396/2024
Engineer Balaji Ganpati Kadam REG/PMC/SITE/1183/2025
Chartered Accountant Omkar U Khude & Company 145562

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

15 February 2021 is when an advocate last certified the title to this land
Title report LATEST SEARCH REOPRT.pdf 15 February 2021 2 older versions on file
Promoter's declaration, Form B AFFIDAVIT CUM DECLARATION.pdf 17 March 2025 2 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100023339
Promoter Nitin Babanrao Tingre
Project typeResidential / Group Housing · Building development
LocalityAirport (Pune) — Pune City taluka, pincode 411032
Applied on09 November 2019
Registered on12 December 2019
Completion, as first filed30 March 2023
Due31 December 2026 3.8 years later
Units declared56
Units sold All 56 sold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 30 June 2026
Application referenceREA52100064856
Current statusActive
Record last changed 30 June 2026 · 3 months ago

Where the sold count comes from, and whether it holds up. 56 of 56 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 56 units and reaches the same answer — 56 sold, every one with money recorded as received against a named unit, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 30 June 2026.

Common questions

Is Tingre Elite Phase 1 registered with MahaRERA?
Yes. It is registered as P52100023339, filed on 12 December 2019, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Tingre Elite Phase 1 due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Tingre Elite Phase 1 been delayed?
Yes. The first date filed was March 2023. It now stands at December 2026, 3.8 years later.
What did buyers actually pay in Tingre Elite Phase 1?
A median of ₹5,566 per square foot of carpet, across 49 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Tingre Elite Phase 1?
None. All 56 are filed as sold or booked.
Are there complaints against Tingre Elite Phase 1?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Tingre Elite Phase 1?
Nitin Babanrao Tingre, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100023339 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Airport (Pune)