Capital Tower & Silver Leaf

Jalochi, Pune · Residential / Group Housing by Shinde Dream Buildcon LLP

Official record Updated from the register 14 October 2026. Anything filed since then is not here yet.

In short

Capital Tower & Silver Leaf in Jalochi is MahaRERA-registered (PR1260002601947) and still under construction, with possession filed for August 2031. No sales are registered in this project yet. Units the same size elsewhere in Jalochi have registered at ₹4,949 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Shinde Dream Buildcon LLP is the promoter.

Stock image, not a photograph of Capital Tower & Silver Leaf Stock image
Where
Jalochi
pincode 413102
Nearby at
₹4,949
per sq ft, same sizes in Jalochi
Available
Bunglow
8 left · 2,393–4,295 sq ft
Possession
Aug 2031
as filed with MahaRERA
A stock photograph, not Capital Tower & Silver Leaf. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Jalochi · Baramati

Jalochi, Baramati, Pune, 413102

Village Jalochi
Taluka Baramati
Pincode 413102
Promoter Pin Coordinates 18.163323, 74.594372

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 16 flats are filed unit by unit with the authority, the highest on floor 0. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
16 Total Licenced Units
Residential Typology • 100.0% of tower

Bunglow Residences

8 Available 16 registered total
Estimated Market Window ₹1.2 crore – ₹2.1 crore
Locality Benchmark ₹4,949 / sq ft
Carpet Variations as Filed Span: 2393 to 4295 sq ft
2393 sq ft 222.29 sq m 7 units
2431 sq ft 225.83 sq m 7 units
4295 sq ft 399.02 sq m 2 units
Govt ASR Base: ₹80.4 lakh – ₹1.4 crore 8 of 16 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
Bunglow 2393 – 4295 sq ft (222.29 – 399.02 sq m) ~2872 – 5154 sq ft ~3350 – 6013 sq ft 8 left of 16
Units sold

0 / 16

Pre-launch / early phase

0% absorption rate

What flats like these cost nearby

No sale has been registered at Capital Tower & Silver Leaf yet. The promoter has filed no agreement values, so nothing below is this project's own price.

Independent Market Intelligence

Registered Agreement Rates in Jalochi

Based on 15 government-stamped sale deeds registered for identical carpet bands across nearby developments.

Bunglow 2,393–4,295 sq ft
₹4,949 / sq ft

15 registered sale agreements across 3 nearby developments.

Estimated Unit Market Window ₹1.2 crore – ₹2.1 crore
Middle Half (IQR) ₹3,827 – ₹6,471 / sq ft
25th percentile: ₹3,827 75th percentile: ₹6,471

Each rate is what buyers contracted to pay for the same configuration in Jalochi, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Jalochi.

The state values these at ₹3,360 per sq ft of carpet — one rate across all 8 still available, which puts the smallest at ₹80.4 lakh and the largest at ₹1.4 crore. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Aug 2031
Declared at registration
Current Statutory Date
Due
Aug 2031
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gut No. 169/1 is the plot this project is built on, as filed
Revenue village Jalochi
TalukaBaramati
Plot No.1,2,3,4,5,6,7,8,PLOT NO-22 AMENITY-A
Road or street, as filedBHIGWAN ROAD
SocietyCAPITAL TOWER AND SILVER LEAF
Street, as filed Bhigwan Road
Bounded north by Baramati Bhigwan Road
Bounded east by Gat No. 170
Bounded south by Layout Within Internal Road
Bounded west by 12 Meter Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerShinde Dream Buildcon LLP
Registered officeGat No. 2/2/B, Baramati, Abhang Chouk, Pune 413102

Professionals named on the filing

Architect Shreeraj Associates STATE/R/2023/APL/05051
Engineer Tajuddin Mahmadalli Shaikh STATE/R/2025/APL/15696
Chartered Accountant R H Pothiwal & Associates 612297

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

11 September 2026 is when an advocate last certified the title to this land
Title report Legal Title Report.pdf 11 September 2026
Conveyance deed 7-12.pdf 26 August 2026
Promoter's declaration, Form B Developers Form B.pdf 29 August 2026
Annexure A declaration Declaration of one plot one Registration.pdf 26 August 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002601947
Promoter Shinde Dream Buildcon LLP
Project typeResidential / Group Housing · Building development
LocalityJalochi — Baramati taluka, pincode 413102
Applied on31 August 2026
Registered on17 September 2026
Completion, as first filed31 August 2031
Due31 August 2031
Units declared16
Units sold None sold yet, all 16 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 17 September 2026
Application referenceACK26082602917
Current statusActive
Record last changed 17 September 2026 · 27 days ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 16 flats are gone, and the unit-by-unit list they file separately says the same: all 16 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 17 September 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Capital Tower & Silver Leaf registered with MahaRERA?
Yes. It is registered as PR1260002601947, filed on 17 September 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Capital Tower & Silver Leaf due to be handed over?
The promoter has told MahaRERA August 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Capital Tower & Silver Leaf been delayed?
No. August 2031 is the date first filed with the authority and it has not moved since.
What does a flat in Capital Tower & Silver Leaf cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Jalochi have registered at ₹4,949 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Capital Tower & Silver Leaf?
8 of 16 were still unsold at the promoter's last filing, in Bunglow, from 2,393–4,295 sq ft of carpet.
Are there complaints against Capital Tower & Silver Leaf?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Capital Tower & Silver Leaf?
Shinde Dream Buildcon LLP, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 14 October 2026. The authority's own registry page for PR1260002601947 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Jalochi

Stock image, not a photograph of Kate Elite Stock image
Nearby
₹3,592–3,976
On offer
2, 3 BHK + shops
Under construction

Kate Elite

Sagar Mahadeo Kate · Jalochi

0 sold
Slipped 4 months
Due
Oct 2027
Units
64
Carpet
128–965
Typical unit
~₹29.9 lakh
P52100080240
Stock image, not a photograph of Kolekar Appartment Stock image
Registered here
₹2,695
On offer
2 BHK + shops
Under construction

Kolekar Appartment

Rajan Dhananjay Kolekar · Jalochi

76 sold
Slipped 4 months
Due
Nov 2027
Units
29
Carpet
464–819
Sold at
₹15 lakh
P52100080740
Stock image, not a photograph of Leo Grand Stock image
Registered here
₹4,144
On offer
2, 3 BHK
Under construction

Leo Grand

Prathmesh Bajrang Kharmate · Jalochi

27 sold
Slipped 4 months
Due
Apr 2033
Units
56
Carpet
804–981
Sold at
₹34.1 lakh
P52100079772