Z Zomefy

RERA registered PR1260002602835 Active

Sapphire Estates-Evara

Golegaon, Pune · Residential / Group Housing by Tejas Sunil Barmecha

Official record Updated from the register 25 November 2026. Anything filed since then is not here yet.

In short

Sapphire Estates-Evara in Golegaon is MahaRERA-registered (PR1260002602835) and still under construction, with possession filed for December 2028. No sales are registered in this project yet. Across Golegaon, buyers have been registering around ₹4,120 per sq ft of carpet (35 sales in the locality) — the area median, not this building. None of the units are filed as sold yet. Tejas Sunil Barmecha is the promoter.

Stock image, not a photograph of Sapphire Estates-Evara Stock image
Where
Golegaon
pincode 412210
Golegaon at
₹4,120
per sq ft across the locality, not this project
Available
Row Houses
16 left · 931–1,194 sq ft
Possession
Dec 2028
as filed with MahaRERA
A stock photograph, not Sapphire Estates-Evara. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Shirur Gramin · Shirur

Golegaon, Pune, 412210

Street map of Golegaon centred on the coordinate filed for Sapphire Estates-Evara, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village Shirur Gramin
Taluka Shirur
Pincode 412210
Promoter Pin Coordinates 18.824911, 74.377547

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 16 flats are filed unit by unit with the authority, the highest on floor 1. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
16 Total Licenced Units
Residential Typology • 100.0% of tower

Row Houses Residences

16 Available 16 registered total
Estimated Market Window ₹38.4 lakh – ₹49.2 lakh
Locality Benchmark ₹4,120 / sq ft
Carpet Variations as Filed Span: 931 to 1194 sq ft
931 sq ft 86.51 sq m 8 units
1016 sq ft 94.38 sq m 1 unit
1019 sq ft 94.7 sq m 5 units
1114 sq ft 103.52 sq m 1 unit
1194 sq ft 110.95 sq m 1 unit
Govt ASR Base: ₹26.1 lakh – ₹33.5 lakh 16 of 16 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
Row Houses 931 – 1194 sq ft (86.51 – 110.95 sq m) ~1117 – 1433 sq ft ~1303 – 1672 sq ft 16 left of 16
Units sold

0 / 16

Pre-launch / early phase

0% absorption rate

What flats like these cost nearby

No sale has been registered at Sapphire Estates-Evara yet. The promoter has filed no agreement values, so nothing below is this project's own price.

Median across Golegaon ₹4,120 per sq ft of carpet, from 35 registered sales
The middle half of them ₹3,880 to ₹4,661 per sq ft
Carpet sizes filed here931–1194 sq ft
Still available 16 flats

This is Golegaon as a whole and not a rate for Sapphire Estates-Evara, and it is pooled across every configuration the locality has registered — studios and four-bedroom flats included — because Golegaon has not filed enough sales of any single configuration on sale here to quote one separately. Treat it as the order of magnitude for the area rather than a figure to negotiate against. See the full distribution for Golegaon.

The state values these at ₹2,804 per sq ft of carpet — one rate across all 16 still available, which puts the smallest at ₹26.1 lakh and the largest at ₹33.5 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Dec 2028
Declared at registration
Current Statutory Date
Due
Dec 2028
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gut No. GAT NO 598/3 is the plot this project is built on, as filed
Revenue village Shirur Gramin · shown on this site as Golegaon
TalukaShirur
Street, as filed A/P. Shirur Gramin
Bounded north by Gat No. 618
Bounded east by 12 Meter Internal Road
Bounded south by Gat no. 598/2 Part
Bounded west by Gat No. 591

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerTejas Sunil Barmecha
Registered officeFlat No 202, Solatire Five, Bibveadi, Bibvewadi Kondhwa Road, Pune 411037

Professionals named on the filing

Chartered Accountant Akshay Gala & Associates 646493

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

16 October 2026 is when an advocate last certified the title to this land
Title report Title Report RERA Format.pdf 16 October 2026
Conveyance deed Sale deed.pdf 16 October 2026
Promoter's declaration, Form B form B.pdf 16 October 2026
Annexure A declaration Annexure A.pdf 19 October 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002602835
Promoter Tejas Sunil Barmecha
Project typeResidential / Group Housing · Building development
LocalityGolegaon — Shirur taluka, pincode 412210
Applied on16 October 2026
Registered on23 November 2026
Completion, as first filed01 December 2028
Due01 December 2028
Units declared16
Units sold None sold yet, all 16 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 23 November 2026
Application referenceACK16102603872
Current statusActive
Record last changed 23 November 2026 · 2 days ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 16 flats are gone, and the unit-by-unit list they file separately says the same: all 16 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 23 November 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Sapphire Estates-Evara registered with MahaRERA?
Yes. It is registered as PR1260002602835, filed on 23 November 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Sapphire Estates-Evara due to be handed over?
The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Sapphire Estates-Evara been delayed?
No. December 2028 is the date first filed with the authority and it has not moved since.
What does a flat in Sapphire Estates-Evara cost?
Nothing has been registered in this project yet, so it has no price of its own. Across Golegaon the median registered rate is ₹4,120 per square foot of carpet, which is the area rather than this building.
How many flats are left in Sapphire Estates-Evara?
16 of 16 were still unsold at the promoter's last filing, in Row Houses, from 931–1,194 sq ft of carpet.
Are there complaints against Sapphire Estates-Evara?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Sapphire Estates-Evara?
Tejas Sunil Barmecha, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 25 November 2026. The authority's own registry page for PR1260002602835 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Golegaon