Z Zomefy

RERA registered P52100023719 Completed

GreenVille Layout B

Alandi, Pune · Plotted by Sri Kalpatru Realty Private Limited

Official record Updated from the register 23 October 2026. Anything filed since then is not here yet.

In short

GreenVille Layout B in Alandi is MahaRERA-registered (P52100023719) and was handed over in September 2020. No registered sale rate is on file for this project or its locality yet. None of the units are filed as sold yet. Sri Kalpatru Realty Private Limited is the promoter.

Stock image, not a photograph of GreenVille Layout B Stock image
Where
Alandi
pincode 412105
Price
Not filed
no agreement or valuation on the register
Available
Not filed
the promoter filed no unit list
Possession
Sep 2020
as filed with MahaRERA
A stock photograph, not GreenVille Layout B. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Pimpri Chinchawad (M Corp.) · Haveli

Alandi, PCMC, Pune, 412105

Street map of Alandi centred on the coordinate filed for GreenVille Layout B, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village Pimpri Chinchawad (M Corp.)
Taluka Haveli
Pincode 412105
Promoter Pin Coordinates 18.663941, 73.874915

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

How much of this has sold

Carpet areas and the unit-by-unit breakdown are filed for most projects but are missing for this one, so the count below is all the register holds on what is being built here.

Units sold

0 / 25

Pre-launch / early phase

0% absorption rate

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Sep 2020
Declared at registration
Current Statutory Date
Handed over
Sep 2020
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

39/1A, 39/2 PART,40/1C PART, 40/2 PART, CHOVISAWADI. PCMC is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Alandi
TalukaHaveli
Street, as filed -
Bounded north by Land Sr No 92
Bounded east by Balance Land in Survey No 39-1A 39-2
Bounded south by Land Sr No 39-2 40-1C 40-2
Bounded west by Land Sr No 40-2

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSri Kalpatru Realty Private Limited
Registered officeGp-187, 2nd Floor, Maruti House, Chinchwad, Thermax Chowk, Pune 411019

Professionals named on the filing

Architect Mr. Amol Bugade of Patil and Bugade Associates
Engineer Alok Kulkarni of Shrikhande Consultants Pvt Ltd
Engineer Babu Nandgaon
Chartered Accountant CA Sunny C Thawani

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

17 December 2019 is when an advocate last certified the title to this land
Title report 2_Search_Report_GVB_1.pdf 17 December 2019 2 older versions on file
Promoter's declaration, Form B Affidavit Layout B.pdf 19 December 2019

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100023719
Promoter Sri Kalpatru Realty Private Limited
Project typePlotted · Plotted development
LocalityAlandi — Haveli taluka, pincode 412105
Applied on23 December 2019
Registered on02 January 2020
Completion, as first filed15 September 2020
Handed over15 September 2020
Units declared25
Units sold None sold yet, all 25 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 28 June 2020
Application referenceREA52100066463
Current statusCompleted
Record last changed 02 January 2020 · over 6 years ago

Where the sold count comes from, and whether it holds up. 0 of 25 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. There is no unit-by-unit filing on record for this project to check it against, so this is a single unverified number. Either way, this is only as current as the last change to the record, 02 January 2020.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 5 Direct Answers
Is GreenVille Layout B registered with MahaRERA?
Yes. It is registered as P52100023719, filed on 02 January 2020, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has GreenVille Layout B been handed over?
Yes. The completion date on the register is September 2020.
Has GreenVille Layout B been delayed?
No. September 2020 is the date first filed with the authority and it has not moved since.
Are there complaints against GreenVille Layout B?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building GreenVille Layout B?
Sri Kalpatru Realty Private Limited, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 23 October 2026. The authority's own registry page for P52100023719 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Alandi